Construction on the Upper School and renovations to the Lower School are in full swing. The transition from three to two campuses is on track to be completed next summer. The elementary school located on Westview Avenue is on the market with hopes of completing the sale by the end of the 2019-20 school year.

Here are a few specific projects that will be finished for the coming school year:

  • Completing the kitchen expansion at the Upper School.
  • Painting and replacing floors at the Lower School (current high school).
  • Installing a new fire safety system at the Lower School.
  • Opening a new entrance and ticket booth at Founders Field.

Each week we share pictures, videos, and interviews with the construction crew on social media and in the WC Photo Gallery. Follow along to see the impact of sacrificial gifts made by many in the WC community.  And speaking of gifts, if you have not yet made a gift to the Forward Together campaign, now is a great time to be part of this historic event. Every gift of every size makes a difference. Our aim is to “put a bow” on the campaign by raising $500,000 by December 31 designated for Upper and Lower School furnishings. Follow the link to make a one-time or recurring gift, or learn about other giving options.

Make A Gift

Pictured left to right, top to bottom: (1) The ground is being prepared for expanding the kitchen and weight room at the Upper School. (2) The trophy case at the high school is being replaced with a welcoming entrance wall for Lower School students and guests. (3) The soon-to-be Lower School will feature bright colors and themed hallways. (4) Trenches are being dug for sanitation and water lines.